3.1 Basic information

所属栏目:水电工程围堰设计

3.1.1 Hydrological and meteorological conditions(1) The data of measured discharge, water level and water surfacegradient of river in dam site area in flood and dry periods.(2) The calculated value of maximum annual discharge and designflood hydrograph of ......(本文共 4163 字 )     [阅读本文] >>


推荐内容


科普

更多