7.3.1 The protective measures for cofferdam foot of water-side facein overburden of earth-rockfill cofferdam foundation shall bedetermined based on the hydraulics conditions of foot area anderosion resistance of overburden. The protective materials, which (共 1281 字) [阅读本文] >>