3.0.1 Rationality of building a hydrological telemetry systemshall be justified at the prefeasibility study stage of a HPP, andif necessary, planning design for the system shall be performed.3.0.2 Rationality of the system shall be analyzed and justified (共 1646 字) [阅读本文] >>