4.1.1 General design for the hydrological telemetry systemshall be conducted at the feasibility study stage of a HPP, and ageneral design report shall be separately prepared.4.1.2 The general design of the system shall cover thefollowings.(1) Collecting a (共 1931 字) [阅读本文] >>