3.2.1 Several reference marks shall be arranged near compactionsite and beyond the scope of vibratory roller. Mark the compactionsite by drawing lines and survey the relative elevation of foundationbottom. The survey shall comply with relevant provisions (共 3135 字) [阅读本文] >>