当前位置:首页 > 科普知识 > 土石筑坝材料碾压试验 > 列表
土石筑坝材料碾压试验 共有 38 个文章

1 General Provisions

    1.0.1 This specification is formulated to standardize the placementand roller compaction test on embankment materials of earth androckfill dams and corresponding testing methods, to improve theaccuracy of test results, and to promote the consistency andco...[继续阅读]

土石筑坝材料碾压试验

2 Basic Requirements

    2.0.1 The placement and roller compaction test in design stage is tostudy the engineering properties of embankment materials, evaluatethe quality of embankment materials and provide basic parameters fordesign. The placement and roller compaction test duri...[继续阅读]

土石筑坝材料碾压试验

3.1 Main equipment and apparatus

    3.1.1 Main equipment for placement and roller compaction tests,including smooth drum vibratory roller, excavator, loader, bulldozerand dump truck, etc. shall be selected based on the types andcharacteristics of embankment materials, degree of compaction,p...[继续阅读]

土石筑坝材料碾压试验

3.2 Process requirements before roller compaction

    3.2.1 Several reference marks shall be arranged near compactionsite and beyond the scope of vibratory roller. Mark the compactionsite by drawing lines and survey the relative elevation of foundationbottom. The survey shall comply with relevant provisions ...[继续阅读]

土石筑坝材料碾压试验

3.3 Requirements for roller compaction test

    3.3.1 Start the selected vibratory roller to normal operatingcondition outside the compaction site and then guide it into the site ata speed of 2 km/h to 3 km/h by test personnel. Operate the vibratoryroller by traveling forward and backward repeatedly (a...[继续阅读]

土石筑坝材料碾压试验

3.4 Testing

    3.4.1 Density test(1) Pit watering method shall be adopted in density test. Themeasuring points should be distributed uniformly.(2) Place lantern rings steadily on the measuring points. The distancefrom the outer edge of the ring to the side boundary of t...[继续阅读]

土石筑坝材料碾压试验

3.5 Compilation of test results

    3.5.1 The average settlement amount h and average accumulativesettlement ratio μ of each test block are calculated by Equation(3.5.1-1) and Equation (3.5.1-2):Where:Δh average settlement amount of a test block, mm.hiq =relative elevation of grid intersec...[继续阅读]

土石筑坝材料碾压试验

4.1 Main equipment and apparatus

    4.1.1 Main equipment for the placement and roller compaction test,including self-propelled smooth drum vibratory roller, excavator,loader, bulldozer, dump truck, etc. shall be selected based on thetypes and characteristics of embankment materials, degree ...[继续阅读]

土石筑坝材料碾压试验

4.2 Process requirements before compaction

    4.2.1 The base of compaction site shall be measured as perprovisions of 3.2.1.4.2.2 Sampling from borrow areas and quarries.(1) Sample uniformly up and down around the material piles or at theexit of belt conveyor. The samples obtained shall be representa...[继续阅读]

土石筑坝材料碾压试验

4.3 Requirements for roller compaction test

    4.3.1 The roller compaction test shall comply with provisionsspecified in 4.3.4.3.2 The compaction test shall be reviewed as per the selectedoptimum compaction parameters. Such in-situ tests as load test, directshear test and seepage deformation test shal...[继续阅读]

土石筑坝材料碾压试验
科普知识
心理健康 优生优育 休闲旅游 健身美容 饮食健康 人与自然 地球家园 海洋技术 科海拾贝 科学之迷 科技前沿 科技史话 科幻未来 神话传说 童话故事 致富指南 农用物资 生物技术 畜牧兽医 园林花卉 特产养殖 营养早餐 减肥晚餐 晚餐食谱 营养晚餐 减肥中餐 中餐文化 中餐菜谱 中餐营养 健康早餐 减肥早餐 早餐食谱 晚餐禁忌 宝石鉴定 安全生产 安装钳工 钣金技术 宝石观察 焙烤工业 变性淀粉 插花技能 车工技术 道路工程 低压电器 电气工程 电气设备 电网工程 电源技术 电站工程 淀粉科学 调味配方 发电节能 防水材料 飞机飞行 服装生产 钢铁材料 工程建设 工业工程 公路工程 管道工程 罐头工业 国际组织 国家电网 华北电网 火电工程 货运物流 机床设计 机电工程 机修钳工 基本资料 家用电器 建设工程 节约用电 金银技术 金属材料 连续铸钢 轮机工程 奶牛养殖 农村电工 配电技术 皮革工业 啤酒工业 苹果产业 钳工简明 青工车工 青年审美 肉类工业 入侵检测 食品科学 世界修船 兽医兽药 水下工程 税收制度 通信设备 统计公文 土木工程 维修电工 味精工业 文物鉴赏 物业电工 铣工计算 线损管理 鞋楦设计 烟草工业 盐业产品 冶金产品 液压技术 印刷科技 用电管理 油墨技术 轧钢技术 粘接技术 照明设计 制浆造纸 土元养殖 兔场疾病 外国美术